some of our projects
Mabro Engineering
(Kriel Power Station)
Mabro Engineering (Kriel Power Station)
Installing and commissioning HDPE bypass line and installing a new power station demin water pipeline
September 2019 - January 2020
September 2019 - January 2020
Siyanda Bakgatla Platinum Mine
Siyanda Bakgatla Platinum Mine
Structural Repairs and Corrosion protection on Shaft Headgear
March 2020 - Current
March 2020 - Current
BMW Rosslyn Plant
BMW Rosslyn Plant
Structural Repair on Water Reservoir
November 2020 - December 2020
November 2020 - December 2020
Siyanda Bakgatla Platinum Mine
Siyanda Bakgatla Platinum Mine
Corrosion Protection on Reef Silo 1 Support Beams
February 2021 - March 2021
February 2021 - March 2021
Siyanda Bakgatla Platinum Mine
Siyanda Bakgatla Platinum Mine
Silo 2 NDT tests and Analysis by Engineer(Pr Eng Structural)
July 2021 - August 2021
July 2021 - August 2021
Siyanda Bakgatla Platinum Mine
(4 South Decline Shaft)
Siyanda Bakgatla Platinum Mine (4 South Decline Shaft)
Concrete Silo Structural Integrity Assessment
September 2021 - October 2021
September 2021 - October 2021
BMW Rosslyn Plant
BMW Rosslyn Plant
Lay Vinyl Tiles at Engine Room
November 2021 - Novemebr 2021
November 2021 - Novemebr 2021
Siyanda Bakgatla Platinum Mine
Siyanda Bakgatla Platinum Mine
Headgear Corrosion Protection)
November 2021 - May 2022
November 2021 - May 2022
Siyanda Bakgatla Platinum Mine
Siyanda Bakgatla Platinum Mine
Ore Bin and Chutes
November 2021 - June 2022
November 2021 - June 2022
Siyanda Bakgatla Platinum Mine
Siyanda Bakgatla Platinum Mine
Silo NDT and Structural Integrity Assessment
Hydraulic Room Retaining Wall Design and Construction
Hydraulic Room Retaining
Hydraulic Room Retaining Wall Design and Construction
Headgear Corrosion Protection
Headgear Corrosion Protection
Headgear Legs
Headgear Legs
Sandblasting on Headgear Legs
silo
silo
Rolled steel plates installed around silo
Chute
Chutes
Fabricated Laanlagte and Delivery Chutes
Fabricated Receiving Chute
More of our projects
Grout Silo 2 NDT tests and Analysis by Engineer(Pr Eng Structural)
Siyanda Bakgatla Platinum MineJuly 2021 - August 2021
Concrete Silo Structural Integrity Assessment
Siyanda Bakgatla Platinum Mine (4 South Decline Shaft)Sep 2021 - October 2021
Quality System and Plant Procedures - For SASOL Mining Audit
JDA Diamond toolingFeb 2019 – June 2019
Due-diligence study - Evaluating 3 product cyclone plant vs 2 Stage DMS Plant (Crushing, Screening and Evaluation)
Universal CoalApr 2019 - May 2019
Due-diligence study - Evaluating 3 product cyclone plant vs 2 Stage DMS Plant (Crushing, Screening and Evaluation)
Universal CoalApr 2019 - May 2019
Panel of Town Planners (Town Planning, Engineering and Project Management)
Ingquza Hill Local MunicipalityApr 2019 - Current
Modify Measuring Flask 1 and Loading Chute - Design and Implementation
Siyanda Bakgatla Platinum MineJun 2020 - Jun 2020
Corrosion Protection on Reef Silo 1 Support Beams
Siyanda Bakgatla Platinum MineFeb 2021 - March 2021
Roof and Window Leakage Repairs at Polokwane Airport
ATNSNov 2022 - March 2023
Headgear Structural Repairs (Spud Shaft)
Siyanda Bakgatla Platinum MineNov 2022 - April 2023
Modify Measuring Flask 2 and Loading Chute - Design and Implementation
Siyanda Bakgatla Platinum MineAug 2020 - Aug 2020
Ash Silo NDT, Structural Assessment and Design of Thickness Rejection Profile
Siyanda Bakgatla Platinum MineJul 2020 - Aug 2020
Cement Silo 2 NDT, Structural Assessment and Design of Thickness Rejection Profile
Siyanda Bakgatla Platinum MineJul 2020 - Aug 2020
Compressed Air Columns modification at 14 level Belt Incline - Design and Implementation
Siyanda Bakgatla Platinum MineAug 2020 - Aug 2020
Silo 2 Concrete Foundations Repair - Structural Design and Implementation
Siyanda Bakgatla Platinum MineOct 2020 - Dec 2020
Construction of Silo1 Hydraulic Room Concrete Retaining Wall - Design and Implementation
Siyanda Bakgatla Platinum MineNov 2020 - Dec 2020
Structural Repair on Water Reservoir
BMW Rosslyn PlantNov 2020 - Dec 2020
Corrosion Protection on Reef Silo 1 Support Beams
Siyanda Bakgatla Platinum MineFeb 2021 - March 2021
Previous
Next